Challenge and approach
The scope covers laboratories, a pilot plant, and offices, with separate flows for people and materials. The cleanroom is Grade C and includes BSL-2. The Taiwan team carried the design.
Scope
- HVAC
- Cleanroom
Duration
Construction 4 / Design to validation 7 months