Zhendong Integrated Engineering
Turnkey design, construction, and C&Q, plus public-project PCM.
Clean air, built
Design, build, and validate under one contract
Cleanroom standards that come from pharmaceutical GMP. One window for design, construction, and validation.
Particle class · ISO 9 → ISO 7 → ISO 5
Projects
An ISO 7 example: gowning, corridor, and graded rooms, with design, build, and test notes together.
Airlock, gowning, and hand disinfection.
Regulator outcomes are named on each project: PIC/S GMP, TFDA, and others only when that project records them.
Demo
Demo figures. This is not a live plant system.
22.4°C · 48% RH · +15 Pa · Demo
ΔP alarm · Demo
Grade C −2 Pa / 00:14
The construction contract and the consulting validation are separate, so the builder is not the only author of the qualification report.
Turnkey design, construction, and C&Q, plus public-project PCM.
Engineering consulting, project management, and validation.
info@pharmeng.tw