Clean air, built

High-tech cleanrooms

Design, build, and validate under one contract

Cleanroom standards that come from pharmaceutical GMP. One window for design, construction, and validation.

Particle class · ISO 9 → ISO 7 → ISO 5

Pressure cascade

An ISO 7 example: gowning, corridor, and graded rooms, with design, build, and test notes together.

Airlock, gowning, and hand disinfection.

Figures we can publish

2,017 Founded
17 Published projects
20,000 Largest single area m²
5 Shortest design-to-validation (months)

Regulator outcomes are named on each project: PIC/S GMP, TFDA, and others only when that project records them.

Demo

24/7 environmental monitoring

Demo figures. This is not a live plant system.

22.4°C · 48% RH · +15 Pa · Demo

ΔP alarm · Demo

Grade C −2 Pa / 00:14

EVMS section

Two companies, one team

The construction contract and the consulting validation are separate, so the builder is not the only author of the qualification report.

Zhendong Integrated Engineering

Turnkey design, construction, and C&Q, plus public-project PCM.

Zhenchang Technology Engineering

Engineering consulting, project management, and validation.

How an engagement runs

  1. 01Interview / URS
  2. 02Concept and quote
  3. 03Design
  4. 04Construction
  5. 05TAB / C&Q
  6. 06Handover and monitoring

Request an interview

info@pharmeng.tw