Design

Design

From URS to DQ. Zoning and flows are settled before construction starts.

Request an interview

URS / feasibility

Capacity, grade, regulation, and site limits, written so they can be priced.

Concept to detail

Plans, HVAC strategy, and utilities, then drawings a DQ review can use.

People and materials

Gowning, raw materials, waste, and product stay apart. Pressure follows the flow.

Gowning Corridor Grade C Grade B
  • GowningISO 8
  • CorridorISO 8
  • Grade CISO 7
  • Grade BISO 5

Zhenchang can consult, or Zhendong can carry design inside a turnkey contract. Drawings stay usable for build and qualification.

info@pharmeng.tw